Watlow Silver Series EM Installation Guide Introduction Thank you for purchasing a Silver Series EM graphic operator interface terminal (OIT) from Wat
10 Watlow Silver Series OIT Installation Guide and capacitor (~4700 pF) in parallel to clean earth ground on the DC output of the power supply. Do no
11 Watlow Silver Series OIT Installation Guide coil excess cable and place it next to AC powered equipment. • Cover any equipment used in the enclos
12 Watlow Silver Series OIT Installation Guide Figure 4: OIT Power Wiring To connect the OIT to power: 1. Connect the power cable to the OIT.
13 Watlow Silver Series OIT Installation Guide 3. Install the power supply wires as follows (with colors shown for Maple Systems cable P/N 6030-0009
14 Watlow Silver Series OIT Installation Guide surface is not uniform, thick, flat, stiff, or smooth enough, then a sealant such as silicone may be r
15 Watlow Silver Series OIT Installation Guide 2. Set the OIT in the panel cutout and hold it in place until all clamps are in position. 3. Tighten
16 Watlow Silver Series OIT Installation Guide Maintenance Figure 6: DIP switch positions (power must be cycled on the OIT to enable the DIP switch
17 Watlow Silver Series OIT Installation Guide Serial Port Connections The diagrams below indicate the proper pin connections for the serial ports o
18 Watlow Silver Series OIT Installation Guide Figure 7b: Serial Port Pinouts TS00-0100-EM00 (HMI5100L), TS00-0070-EM00 (HMI5070L) TS00-0100-EM0
2 Watlow Silver Series OIT Installation Guide Static Awareness Do NOT remove the rear cover of your Silver Series EM product – doing so will void you
3 Watlow Silver Series OIT Installation Guide Warranty Maple Systems warrants each product to be free from electrical and mechanical defects in mater
4 Watlow Silver Series OIT Installation Guide Installation of OITs CE Compliance The Silver Series EM Graphic OITs have been tested to conform to Eur
5 Watlow Silver Series OIT Installation Guide vibration or shocks. Do not install the OIT in enclosures with rapid temperature variations or high hum
6 Watlow Silver Series OIT Installation Guide Figure 1: Typical Panel Layout 1. Also HMI5121XL and HMI5150XL 2. Also HMI5043L and HMI5070NL Control
7 Watlow Silver Series OIT Installation Guide from one device influences the operation of the other devices. • Connect the OIT chassis ground termin
8 Watlow Silver Series OIT Installation Guide NOTE: If the control panel is made of a non-conductive material, it is essential that you connect the c
9 Watlow Silver Series OIT Installation Guide Figure 2b: Chassis Ground Connection – TS00-0100-EM00 (HMI5100L) Power Supply Selection The power su
Comentarios a estos manuales