Watlow Electric Silver Series Guía de instalación

Busca en linea o descarga Guía de instalación para Los Sistemas De Control De Acceso De Seguridad Watlow Electric Silver Series. Watlow Electric Silver Series Installation guide Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 18
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
Watlow Silver Series EM
Installation Guide
Introduction
Thank you for purchasing a Silver Series EM graphic operator interface
terminal (OIT) from Watlow. The Silver Series EM OITs are configured
using the EZwarePlus software (available separately from Watlow) and
include the following models:
Watlow P/N Maple Systems P/N
4.3” display TS00-0043-EM00 HMI5043L
7.0” display TS00-0070-EM00 HMI5070L
10” display TS00-0100-EM00 HMI5100L
This booklet describes the steps necessary for installing the Silver Series
EM OITs.
Applications Assistance
This manual is designed to provide the necessary in formation for
trouble-free installation and operation of your new Operator Interface
Terminal (OIT). However, if you need assistance, please call Watlow at
(507) 494-5656 between 7 a.m. and 5 p.m. Central Standard Time (CST).
Ask for an Applications Engineer. Or you may e-mail your questions to
wintechsupport@watlow.com.
For information on programming and configuring the OIT, please refer
to the EZwarePlus Programming Manual available from Watlow.
0600-0101-0000 Rev A
Vista de pagina 0
1 2 3 4 5 6 ... 17 18

Indice de contenidos

Pagina 1 - Watlow Silver Series EM

Watlow Silver Series EM Installation Guide Introduction Thank you for purchasing a Silver Series EM graphic operator interface terminal (OIT) from Wat

Pagina 2 - Unpacking the Unit

10 Watlow Silver Series OIT Installation Guide and capacitor (~4700 pF) in parallel to clean earth ground on the DC output of the power supply. Do no

Pagina 3 - Warranty

11 Watlow Silver Series OIT Installation Guide coil excess cable and place it next to AC powered equipment. • Cover any equipment used in the enclos

Pagina 4 - Installation of OITs

12 Watlow Silver Series OIT Installation Guide Figure 4: OIT Power Wiring  To connect the OIT to power: 1. Connect the power cable to the OIT.

Pagina 5

13 Watlow Silver Series OIT Installation Guide 3. Install the power supply wires as follows (with colors shown for Maple Systems cable P/N 6030-0009

Pagina 6

14 Watlow Silver Series OIT Installation Guide surface is not uniform, thick, flat, stiff, or smooth enough, then a sealant such as silicone may be r

Pagina 7

15 Watlow Silver Series OIT Installation Guide 2. Set the OIT in the panel cutout and hold it in place until all clamps are in position. 3. Tighten

Pagina 8

16 Watlow Silver Series OIT Installation Guide Maintenance Figure 6: DIP switch positions (power must be cycled on the OIT to enable the DIP switch

Pagina 9

17 Watlow Silver Series OIT Installation Guide Serial Port Connections The diagrams below indicate the proper pin connections for the serial ports o

Pagina 10 - 0600-0101-0000 Rev A

18 Watlow Silver Series OIT Installation Guide Figure 7b: Serial Port Pinouts TS00-0100-EM00 (HMI5100L), TS00-0070-EM00 (HMI5070L) TS00-0100-EM0

Pagina 11

2 Watlow Silver Series OIT Installation Guide Static Awareness Do NOT remove the rear cover of your Silver Series EM product – doing so will void you

Pagina 12 - Figure 4: OIT Power Wiring

3 Watlow Silver Series OIT Installation Guide Warranty Maple Systems warrants each product to be free from electrical and mechanical defects in mater

Pagina 13

4 Watlow Silver Series OIT Installation Guide Installation of OITs CE Compliance The Silver Series EM Graphic OITs have been tested to conform to Eur

Pagina 14

5 Watlow Silver Series OIT Installation Guide vibration or shocks. Do not install the OIT in enclosures with rapid temperature variations or high hum

Pagina 15 - REINSTALLATION:

6 Watlow Silver Series OIT Installation Guide Figure 1: Typical Panel Layout 1. Also HMI5121XL and HMI5150XL 2. Also HMI5043L and HMI5070NL Control

Pagina 16

7 Watlow Silver Series OIT Installation Guide from one device influences the operation of the other devices. • Connect the OIT chassis ground termin

Pagina 17 - Serial Port Connections

8 Watlow Silver Series OIT Installation Guide NOTE: If the control panel is made of a non-conductive material, it is essential that you connect the c

Pagina 18 - TS00-0070-EM00

9 Watlow Silver Series OIT Installation Guide Figure 2b: Chassis Ground Connection – TS00-0100-EM00 (HMI5100L) Power Supply Selection The power su

Comentarios a estos manuales

Sin comentarios